Explore

John De Joya · Philippines / UTC+8

Quick navigation

Tab to choose · Escape to close · Ctrl / ⌘ K to open
All projects

Web / Demo concept

archeon

An architecture portfolio demo with a scroll-driven 3D construction sequence, interactive house exploration, and illustrative tropical-modern floor plans.

Architecture visualization demo — Amihan House is an illustrative concept, not a completed commission. Project briefs are downloaded locally; no requests are sent.

archeon / interface previewSCREENSHOT
archeon — An architecture portfolio demo with a scroll-driven 3D construction sequence, interactive house exploration, and illustrative tropical-modern floor plans.

01 / CONTEXT

The problem
it addresses.

Makes an illustrative residential concept easier to explore by connecting a reversible 3D construction sequence with camera controls, floor plans, lighting, and material choices in one interactive website.

02 / THE BUILD

What it does.

A frontend architecture portfolio demo built with Next.js, React, TypeScript, Three.js, React Three Fiber, and GSAP. Visitors can explore an original tropical-modern house concept through nine construction stages, camera presets, floor selection, day/night lighting, and material choices. Interactive concept floor plans describe the rooms. A local project-brief form validates and downloads a text draft without sending a request or storing data on a server.

j0hn@portfolio:~

Decorative interface. Commands do not run on your computer.

Welcome to the portfolio terminal. Type help.

Privacy & analytics

This portfolio is a static website. It has no accounts, no database and no advertising trackers. The only analytics is the Google Analytics 4 property described here.

What is measured

Google Analytics 4 (measurement ID G-11E1T1HREX) helps me understand aggregate traffic — which pages and projects are useful — so I can improve the site. It records page views and the interactions you trigger, such as opening a project demo or using the contact links.

What is never sent

Names, email addresses, message contents and any other personal information are never sent to Google Analytics from this site. The contact form only prepares a message in your own email application, and reviews are delivered through Web3Forms, not analytics.

Your choice

Analytics storage is denied until you accept it. You can decline and keep browsing. If you decline, Google may still receive cookieless, aggregated signals without new analytics identifiers; if you accept, Google may set analytics cookies. Your choice is stored in your browser under j0hnvexcoder-analytics-consent; clear your browser storage to be asked again.

Contact

Questions about this notice? Email johnangelodejoya@gmail.com.